High speed coupling, water turbine installation. Location: Cordova, Ontario.
Fifty foot diameter thickener tank being dismantled into transport sized sections for reassembly at a different location.
Eighteen foot diameter gear and drive installation.
Wet
electrostatic precipitator installation.
As can be seen from the photos, Wabi Development Corporation has undertaken a wide variety of mechanical projects. The diverse and specialized mechanical expertise is especially evident on many industrial installations.